Example Health and Safety Risk Assessment
This example of a typical risk assessment is intended as a guide only.
Risk Assessment: The operation of a Hot Water Pressure Washer
Identify the Hazard:
- There could be a risk of bodily injury
- There could be a chemical hazard if it is used
- There could be respiratory irritants due to chemicals
- Possibility of faulty electrical equipment
- Hazard of electric shock
- Possibility of eye injury
- Danger of a fire
- High temperature hazards
- High voltage hazard
- Hot Liquid hazard
- There are hot surfaces
- There is hot water
- Lone working could occur
- There may be a noise hazard
- There could be scolding to the skin
- There could be a skin irritant
- There could be sparks
- There may be spillages of fuel, chemicals or water
- There could be hot splashing
- There could be steam
- There is a tripping hazard
- There is a wet floor
Who may be harmed? ----- The Operator or people nearby
How is the risk controlled?
- Keep the area clear of non essentials
- Avoid loose clothing
- Avoid trailing leads if possible
- Place barriers to restrict access
- Ensure that the operator is a competent person
- Check that electrical equipment is fit for the purpose
- Do electrical safety checks
- Eye protection must be worn
- Good house keeping observed
- Portable appliance testing carried out
- PPE to be used
- Pre-start check undertaken
- Protective gloves to be worn when chemicals applied
- RCD circuit breakers to be used
- Routine maintenance put in place
- Routine safety check undertaken
Estimated Risk Factor:
Likelihood of accident. (1 to 10) ---------------------- 3
Likely severity of injury(1 to 10) ---------------------- 3
3 x 3 = 9
Therefore Risk level:-------------------------------- Medium
What further action is to be taken:-
Control Measure
- Safety Training for operator (Supervisor by 16/11/2007)
- Reduce tripping hazard with hose reel (Supervisor by 16/11/2007)
- Provide PPE for operator (Supervisor by 16/11/2007)
- Place warning signs in position (Supervisor by 16/11/2007)
- Use only approved chemicals (Supervisor by 16/11/2007)
-
Start maintenance Program (Maintenance Manager by 16/11/2005)